Oakland, CA
2,106 sq. ft.
2009

This engineering firm occupies the historic Cathedral Building in downtown Oakland. In the course of construction, building systems and the existing concrete slabs were exposed above and below. Spaces were partitioned with birch plywood and polycarbonate dividers.